国产视频久久久久久免费,国产精品日韩欧美亚洲另类,巜交换邻居女朋友9,成人深夜日本一区二区无

Welcome to Changzhou painuo Electronic Co. ltd.!
contact
  • General manager: Mr.Wang
  • Phone: +86-13382882032
  • Tel: +86-519-83331905
  • Fax: +86-519-89185073
  • Web: sla1688.com
  • E-mail: wkfpainuo@163.com
  • Add: No.15, Xinhu Road, Xueyan Town, Wujin District, Changzhou City
problem
Position:Home > problem >

Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
欧美精品538在线视频| 大鸡吧操我在线视频观看| 久久色最新在线观看不卡| 最新精品国产自偷在自线| 在线观看黄视频| 欧美日韩国产免费在线视频| 久久这里只有精品91福利| 久久热精品视频| 伸进去摸老妇的毛| 不扣钮的女孩电影| 国内揄拍国内精品少妇国语| 一级a做片免费观看久久| 免费无码又刺激高潮视频| 国产成人亚洲精品无码影院bt| 久久国产视频专区一二三| 欧洲日本韩国国产在线一区| 日韩精品中文字幕第1页| 亚洲孕天码区二区三区久久| 久久久久亚洲av麻豆精品| 成年轻人视频www无码| 一本色道久久鬼综合88| 综合久久久无码一区二区| 久久五月婷婷爱综合亚洲| 老婆出轨时接听老公电话| 最近在线中文字幕一区二区| 国产美女自慰冒白浆久久| 青娱乐久草精品| 亚洲第一页自拍偷拍av| 免费国产黄网站在线观看视频| 午夜骚影黄色WWWWW| 国产成人综合精品一区二区| 日韩精品毛片无码一区到三区| 久久久久人妻一区精品色| 人人添人人澡人人澡人人人人 | 女人和拘做受全过程免费| 中文字幕人妻少妇伦伦AV| 国产欧美一区二区三区精品| 欧美 日韩 二区 亚洲| 老司机精品一区二区三区| 中文字幕日韩精品制服诱惑| 成人av资源网亚洲第一区|